Mobile heat pipe cooled fast reactor system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11515053
APP PUB NO 20200373029A1
SERIAL NO

16866336

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mobile heat pipe cooled fast nuclear reactor may be configured for transportation to remote locations and may be able to provide 0.5 to 2 megawatts of power. The mobile heat pipe cooled fast reactor may contain a plurality of heat pipes that are proximate to a plurality of fuel pins inside the reactor. The plurality of heat pipes may extend out of the reactor. The reactor may be configured to be placed in a standard shipping container, and may further be configured to be contained within a cask and attached to a skid for easier transportation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRIAD NATIONAL SECURITY LLCLOS ALAMOS NATIONAL LABORATORY LC/TAS P O BOX 1663 LOS ALAMOS NM 87545

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dasari, Venkateswara Rao Los Alamos, US 5 26
Dixon, David Duff Elder, US 3 27
Kapernick, Richard J Los Alamos, US 2 20
McClure, Patrick Ray Los Alamos, US 5 31
Poston, David Irvin Los Alamos, US 4 31
Reid, Robert Stowers Santa Fe, US 6 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00