Hydrothermic liquefaction outputs and fractions thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11518702
APP PUB NO 20210023472A1
SERIAL NO

16979639

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Commercially beneficial carbon-containing fractions can be recovered from hydrothermal liquefaction reactions in various types of processors. Feedstock slurry from waste solids is placed into a pressurized processor where it is maintained at temperature and pressure for a predetermined period. On discharge from the processor the processed discharge is separated into liquid and solid fractions. Gaseous fractions including carbon dioxide can also be removed or off-taken from the processor. New molecular structures are created in this reaction, resulting in fractions including biogas, biofuels, biosolids and biocrude. Silica, phosphates, potash and low concentration nitrogen based fertilizer, along with carbonaceous material can also be recovered.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NULIFE GREENTECH INCSASKATOON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eidem, Brock Saskatoon, CA 5 0
Kristian, Jerry Saskatoon, CA 5 0
Voldeng, Peter Saskatoon, CA 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00