Melting furnace electrode handling devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11523477
APP PUB NO 20210329752A1
SERIAL NO

17273171

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses for interfacing with an electrode provided with a melting furnace including a vessel and an electrode. In some embodiments, a support assembly (50) supports the electrode outside of the vessel, and includes a cart (102) or similar apparatus that permits or facilitates selective vertical movement of the electrode and selective transverse movement of the electrode. In some embodiments, a push assembly (52) interfaces with a rear face of the electrode outside of the vessel, and is operable to apply a pushing force onto the rear face. The push assembly can include one or more tracks (e.g., threaded screw) that supports a body between opposing arms of a fixed frame. The body can translate along the tracks to apply a pushing force onto the electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CORNING INCORPORATEDSP-TI-3-1 CORNING NY 14831

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cook, Mark Alan Painted Post, US 5 5
Fraley, Raymond Eugene Waverly, US 10 96
Palmer, Brian Michael Corning, US 2 3
Riegel, Kevin Scott Owego, US 4 11
Zimmerman, Tytus Lee Columbia Cross Roads, US 5 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00