Power plant-connected energy storage system and method of controlling same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11527888
APP PUB NO 20200313431A1
SERIAL NO

16826311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power plant-connected energy storage system maintains frequency quality of power generated and supplied by a power plant. The system includes an electric energy storage unit that includes two or more batteries of different types and is configured to be charged or discharged to improve frequency quality of power output from the power plant; and a power conditioner configured to control of the power output from the power plant and to control charge and discharge at least one of the two or more batteries in accordance with the control of the power output from the power plant. The two or more batteries include a short cycle battery having a relatively short charge/discharge cycle and a long cycle battery having a relatively long charge/discharge cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTDSEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Tae Hee Yongin-si, KR 102 214
Rhie, Young Hoon Yongin-si, KR 6 32
Youn, Ju Young Yongin-si, KR 12 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00