Amorphous silica products, articles, and particles and methods of producing amorphous silica products, articles, and particles from concrete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11530158
APP PUB NO 20210053865A1
SERIAL NO

16548195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Concrete may be melted to form a glass product. Methods and batch compositions including concrete may be used to produce amorphous silica materials including, but not limited to, glass, container glass, fiber glass, glass bead, glass spheres, sheet or plate glass, glass aggregate, glass sand, abrasives, proppants, foamed glass, and manufactured glass articles. The initial processing steps include preparing a melt batch comprising concrete and, optionally, other components, melting the melt batch, and cooling the melted melt batch. Further processing steps may be utilized to produce the glass article.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONOX LLC25318 OAK KNOT DR SPRING TX 77389-4021

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Trom, Scott D Spring, US 6 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00