Method for manufacturing engine poppet valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11536167
SERIAL NO

17317773

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

At a diameter-decreasing operation during manufacture of a poppet valve, an intermediate stem portion at which a valve head portion and an intermediate stem portion are made integral by way of a neck portion may be inserted between/among diameter-decreasing tools. Application of compressive forces from compressing surfaces of the diameter-decreasing tools may cause a part of the intermediate stem portion to be decreased in diameter and may cause a main body portion of a first stem portion to be formed and may cause formation of a stepped portion which is continuous with the main body portion, and formation, by an absence of decrease in diameter, of a second stem portion which is broader in girth than the main body portion and which is continuous with the neck portion and which is also continuous with the main body portion by way of the stepped portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITTAN CORPORATIONHADANO-SHI KANAGAWA 257-0031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kunitake, Koji Hadano, JP 2 9
Sasagawa, Yuki Hiratsuka, JP 3 9
Sato, Daiki Hadano, JP 46 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00