Fuel and air injection handling system for a combustor of a rotating detonation engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11536456
APP PUB NO 20190120492A1
SERIAL NO

16164474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel and air injection handling system for a rotating detonation engine is provided. The system includes a compressor configured to compress air received via a compressor inlet and configured to output the air that is compressed as swirling, compressed air through a compressor outlet. The system also includes an annular rotating detonation combustor fluidly coupled with the compressor outlet. The annular rotating detonation combustor has a detonation cavity that extends around an annular axis, the annular rotating detonation combustor configured to combust the compressed air from the compressor in detonations that rotate within the detonation cavity around the annular axis of the annular rotating detonation combustor. The annular rotating detonation combustor is fluidly and directly coupled with the compressor outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joshi, Narendra Digamber Niskayuna, US 136 1707
Tangirala, Venkat Eswarlu Niskayuna, US 67 612

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00