Ion exchange device main body and ion exchange device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11541384
APP PUB NO 20200338473A1
SERIAL NO

16625743

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ion exchange device main body 3 includes: a tubular body 31 into which an ion exchange resin bag 5 accommodating the ion exchange resin is inserted through an opening and which has a liquid outlet 312 in which a liquid outlet port 314 for discharging an ion exchange target liquid to outside is formed; a lid 32 that is supported by the tubular body 31 and has a gas injection portion 324 in which a gas injection port 325 for injecting a to an inside 311 of the tubular body 31 is formed; a lead-out pipe 42 that is connected to the liquid outlet 312 and guides the ion exchange target liquid to the outside; and a check valve 44 that is provided in the lead-out pipe 42 and prevents the ion exchange target liquid from flowing backward from the outside to the inside.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUN MAINTENANCE KOKI CO LTD103 TORISUMI 2-CHOME MIDORI-KU NAGOYA-SHI AICHI 4580025

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukai, Hiroshi Nagoya, JP 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 3, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00