Composite tube with a sacrificial layer for very thin wall heat exchangers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11543066
SERIAL NO

16429337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Composite tube assemblies and thin-walled tubing are disclosed. In embodiments, the composite tube assemblies include a functional tube and a sacrificial tube disposed within or around the functional tube. The sacrificial tube may be removed by exposure to a corrosive media, without substantially affecting the functional tube. Methods of forming composite tube assemblies and thin-walled tubing are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VIANT AS&O HOLDINGS2 HAMPSHIRE STREET FOXBOROUGH MA 02035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Broadley, Mark W Downingtown, US 15 34
Eckert, John K Boyertown, US 5 375
Loeper, Louis Pottstown, US 1 0
Manderachi, Ben Douglassville, US 1 0
Willman, Dennis Reading, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 3, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00