Method for producing rubber wet masterbatch and method for producing rubber composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11548987
APP PUB NO 20210230380A1
SERIAL NO

17153290

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a rubber wet masterbatch includes mixing a rubber latex solution and a coagulant with a carbon black-containing slurry aqueous solution in which a carbon black is dispersed in water, to produce a carbon black-containing rubber latex aqueous solution having a pH of 7 to 8.5; adding additional coagulant to the carbon black-containing rubber latex aqueous solution obtained to produce a carbon black-containing rubber coagulum; and dehydrating and drying the carbon black-containing rubber coagulum obtained to produce a rubber wet masterbatch, wherein a rubber component contained in the rubber latex solution is added at an addition rate of 10 g/min or more and 100 g/min or less and the part of the coagulant is added at an addition rate of 10 mmol/min or more and 100 mmol/min or less per 100 g of the carbon black contained in the carbon black-containing slurry aqueous solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO TIRE CORPORATIONITAMI-SHI HYOGO 664-0847

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inada, Yonosuke Itami, JP 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00