Skid steer manure spreader attachment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11553637
APP PUB NO 20210022285A1
SERIAL NO

16863908

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The skid steer manure spreader attachment includes a main bucket compartment, a cover, and a beater shaft. The bucket, cover, and beater shaft are preferably formed of welded steel. The bucket has an industry standard quick attach plate on the back so it can be quickly attached to any standard skid steer, and is a standard width. A hydraulic motor operates the beater shaft and the cover. The beater shaft has blades angled in two directions. The beater shaft spins forward so the beater blades through manure out of the top of the bucket, above the shaft. The hydraulic motor drives the top sprocket, and a chain drives the bottom sprocket. A tensioner pivots on one screw to allow the user to tension the chain as needed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRABER NOAHGRABILL IN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Graber, Noah Grabill, US 2 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 17, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00