Laser annealing apparatus and method of manufacturing substrate having poly-si layer using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11556002
APP PUB NO 20210033853A1
SERIAL NO

16802011

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a laser annealing apparatus and a method of manufacturing a substrate having a poly-Si layer using the laser annealing apparatus. The laser annealing apparatus includes a laser beam source that emits a linearly polarized laser beam, a polygon mirror that rotates around a rotation axis and reflects the laser beam emitted from the laser beam source, a first Kerr cell disposed on a laser beam path between the laser beam source and the polygon mirror, and a first optical element that directs the laser beam reflected by the polygon mirror toward an amorphous Si layer where the laser beam is irradiated upon the amorphous Si layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTDGYEONGGI-DO 17113

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek, Jongjun Yongin-si, KR 21 15
Kim, Jihwan Yongin-si, KR 248 5241
Okumura, Hiroshi Yongin-si, KR 136 1197
So, Byungsoo Yongin-si, KR 18 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 17, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00