Adhesive composition, adhesive layer and adhesive sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11560499
APP PUB NO 20190292425A1
SERIAL NO

16465475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an adhesive composition containing a base polymer and a moisture-curable component, wherein the base polymer contains a polymer having no functional group which reacts with the moisture-curable component, and a water content of the base polymer after storage at 25° C. and 50% RH for 24 hours is 0.1% by weight or less, and wherein the moisture-curable component is contained in an unreacted state, an adhesive layer made from the adhesive composition, and an adhesive sheet including the adhesive layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITTO DENKO CORPORATION1-1-2 SHIMOHOZUMI IBARAKI-SHI OSAKA 567-8680

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asai, Ryoko Ibaraki, JP 13 16
Kira, Yoshiko Ibaraki, JP 20 18
Okada, Kenichi Ibaraki, JP 150 1351
Shimokawa, Kayo Ibaraki, JP 19 40
Tani, Kensuke Ibaraki, JP 22 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 24, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00