Pulp molding production line and processing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11560673
APP PUB NO 20200248407A1
SERIAL NO

16709039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pulp molding production line including as molding machine, pulp molding robot and press, where a transfer device installed on the pulp molding robot includes a wet pulp transfer mold, with the front of the wet pulp transfer mold including a recessed matching chamber configured to fit over the exterior of a wet pulp product, and a moving rack oriented parallel to the wet pulp transfer mold and connected to the back of the wet pulp transfer mold through a guide mechanism, with a driver connected between the back of the wet pulp transfer mold and the moving rack to drive the moving rack to move relative to the wet pulp transfer mold, and several evenly spaced vacuum chucks provided on a side of the moving rack opposite from the wet transfer mold to acquire the molded pulp product from the press.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHURCON MANUFACTURING INC28W206 W COMMERCIAL AVE UNIT B LAKE BARRINGTON IL 60010

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cen, Gang Zhejiang, CN 8 1
Chen, Shu Zhejiang, CN 68 318

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 24, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00