Power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11563368
APP PUB NO 20200266699A1
SERIAL NO

16479703

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A period from when switching elements S1, S4 at first diagonal positions in a full-bridge inverter are turned off at the same time to when switching elements S2, S3 at second diagonal positions are turned on at the same time, is defined as T1, and a period from when the switching elements S2, S3 at the second diagonal positions are turned off at the same time to when the switching elements S1, S4 at the first diagonal positions are turned on at the same time, is defined as T2. With a total length of T1 and T2 set to be constant, the lengths of T1 and T2 are controlled to be changed every switching cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayase, Kei Chiyoda-ku, JP 11 46
Iwabuki, Hiroyasu Chiyoda-ku, JP 21 112
Kondo, Ryota Chiyoda-ku, JP 61 381
Mizutani, Hiroto Chiyoda-ku, JP 12 41
Murakami, Satoshi Chiyoda-ku, JP 330 8310
Takahara, Takaaki Chiyoda-ku, JP 45 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 24, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00