Integrating ebullated bed hydrocracking and coking units

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11566190
SERIAL NO

17385402

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Integrated processes and systems for the production of distillate hydrocarbons and coke. The process may include feeding a hydrocarbon feedstock, comprising a residuum hydrocarbon fraction, to a residue hydrocracking reactor system to convert hydrocarbons therein, producing a hydrocracked effluent. The hydrocracked effluent may then be fed to a separation system, separating the hydrocracked effluent into one or more distillate hydrocarbon fractions and a vacuum residue fraction. The vacuum residue fraction may be fed to a coker system, converting the vacuum residue fraction into a coke product and a coker vapor effluent, recovering the coke product, and feeding the coker vapor effluent to the separation system. The one or more distillate hydrocarbon fractions are hydroprocessed to produce a hydroprocessed effluent, and the hydroprocessed effluent is separated into product distillate hydrocarbon fractions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUMMUS TECHNOLOGY LLCHOUSTON TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arora, Arun Edison, US 18 50
Koduru, Suresh B Bloomfield, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 31, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 31, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00