Kiln

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11570994
SERIAL NO

16906275

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A kiln includes a stage, a stove, a gas supply assembly, and a combustion device wherein, the stage includes a stage body and a carrier member. The stage body has a first chamber, while the carrier member is detachably disposed at the stage body. The stove is joined to the stage body and has an entry and a second chamber. The gas supply assembly is disposed at the stage body, and part of the gas supply assembly is located in the first chamber. The combustion device is located in the second chamber. The carrier member can be detached from the stage body and be moved out of the stove from the entry so that the first chamber communicates with the second chamber. In this way, the working space inside the kiln can be increased, which is convenient for users to repair and maintain the gas supply assembly or the combustion device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRAND MATE CO LTDNO 120 DAXING ST EAST DIST TAICHUNG CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Chin-Ying Taichung, TW 128 246
Huang, Chung-Chin Taichung, TW 129 420
Huang, Hsin-Ming Taichung, TW 134 304
Huang, Hsing-Hsiung Taichung, TW 122 236
Lin, Kuan-Chou Taichung, TW 67 197
Yeh, Yen-Jen Taichung, TW 99 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 7, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00