Method of manufacturing a brazing sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11571769
APP PUB NO 20210213568A1
SERIAL NO

17268283

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a brazing sheet manufacturing method, a cladding slab is prepared by overlaying at least a core-material slab composed of an aluminum material and a filler-material slab composed of an Al—Si series alloy, in which a metal element that oxidizes more readily than Al is included in at least one of the slabs. A clad sheet is prepared by hot rolling this cladding slab, which then has at least a core material layer composed of the core-material slab and a filler material layer composed of the filler-material slab and disposed on at least one side of the core material. Then, a surface of the clad sheet is etched using a liquid etchant that contains an acid. Subsequently, the clad sheet is cold rolled to a desired thickness. In flux-free brazing, such a brazing sheet is capable of curtailing degradation in brazeability caused by fluctuations in dew point and oxygen concentration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UACJ CORPORATIONCHIYODA-KU TOKYO 100-0004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ide, Tatsuya Aichi, JP 44 204
Suzuki, Taichi Aichi, JP 28 9
Yamayoshi, Tomoki Aichi, JP 39 147
Yanagawa, Yutaka Aichi, JP 31 666

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 7, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00