Tiered display unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11576503
APP PUB NO 20210219746A1
SERIAL NO

17223588

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tiered display unit includes a frame assembly. The frame assembly includes a first side support structure having a plurality of support members that form at least one tier, a second side support structure having a plurality of support members that form at least one tier and a plurality of cross members that connect the first support structure to the second support structure. Select cross members of the plurality of cross members include a pair of elongated components that are spaced apart from each other and occupy an area that is the same as the non-selected cross members. The space between the pairs of elongated components of the select cross members are configured to receive hooks for mating display accessories to the frame assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TARGET BRANDS INCMINNEAPOLIS MN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Albrecht, Jeremiah J Minneapolis, US 11 39
Johnson, Blake M St. Paul, US 32 449
Johnson, Jason W Wayzata, US 73 853

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00