Work method to design extended life slurries

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11577997
SERIAL NO

16923897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method may include comprising: defining engineering parameters of a proposed cement slurry, the engineering parameters comprising at least a compressive strength requirement, a density requirement, a storage time requirement, and a thickening time requirement; selecting, based at least in part on a model of compressive strength, a model of storage time, and the density requirement, at least a cement and mass fraction thereof, at least one supplementary cementitious material and mass fraction thereof, and a water and mass fraction thereof, such that a set cement formed from the cement, the at least one supplementary cementitious material, and the water meets or exceeds the compressive strength requirement and the density requirement; selecting, based at least in part on a model of thickening time, an accelerator and mass fraction thereof; and preparing a cement slurry comprising the cement and mass fraction thereof, the at least one supplementary cementitious material and mass fraction thereof, the water and mass fraction thereof, and the cement retarder and mass fraction thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jandhyala, Siva Rama Krishna The Woodlands, US 46 36
Pineda, Claudia Carmen Humble, US 11 5
Pisklak, Thomas Jason Cypress, US 130 998
Singh, John Paul Bir Kingwood, US 49 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00