Method for preparing a cross-linked hydrogel nanomembrane, the cross-linked hydrogel nanomembrane, TEM grid comprising the same and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11578173
APP PUB NO 20200239642A1
SERIAL NO

16635592

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for preparing a hydrogel nanomembrane comprising: a) formation of a non-cross-linked hydrogel nanofilm on a first substrate; b) cross-linking the non-cross-linked hydrogel with a cross-linking agent to obtain a cross-linked hydrogen nanomembrane; and c) transferring the cross-linked hydrogel nanomembrane to a second substrate, a respective cross-linked hydrogel nanomembrane, a TEM grid comprising the same and use thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAX-PLANCK-GESELLSCHAFT ZUR FORDERUNG DERWISSENSCHAFTEN E V HOFGARTENSTRASSE 2 D-80539 MUNCHEN
QUANTIFOIL MICRO TOOLS GMBHIN DEN BRÜCKENÄCKERN 4 GROSSLÖBICHAU/JENA 07751

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rhinow, Daniel Munich, DE 13 5
Scherr, Julian Ober-Ursel, DE 1 0
Terfort, Andreas Halstenbek, DE 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00