Resin composition, method for producing resin composition, resin composition molded body, and method for producing resin composition molded body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11578183
APP PUB NO 20190309143A1
SERIAL NO

16463401

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resin composition including: a magnetic fluid that includes magnetic particles, a dispersant, and a dispersion medium; and a resin or precursor thereof that includes, in a molecule thereof, at least one partial structure selected from the group consisting of a diene skeleton, a silicone skeleton, a urethane skeleton, a 4- to 7-membered ring lactone skeleton, an alkyl group having from 6 to 30 carbon atoms and an alkylene group having from 6 to 30 carbon atoms, a production method thereof, a resin composition molded body obtained by using the resin composition, and a production method thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOMAR CORPORATION11-2 GINZA 4-CHOME CHUO-KU TOKYO 104-8109

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishizaki, Hirohisa Tokyo, JP 11 20
Ochiai, Akira Tokyo, JP 27 127

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00