Modular indicator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11580828
SERIAL NO

17233834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An indicator module includes first electrodes disposed on a first support surface, each of the first electrodes having a flexible portion having a sloped section forming an oblique angle with the first support surface, a second electrodes disposed on a second support surface spaced apart from the first support surface along a longitudinal direction, a set of conductors elongated substantially in the longitudinal direction, each of the first electrodes being electrically connected to the a respective one of the second electrodes via a respective one of the conductors, and an indicator circuit, such as a set of LEDs, electrically connected to one or more of the conductors and adapted to generate a human perceptible signal when the indicator circuit receives electrical power from the one or more of the conductors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BANNER ENGINEERING CORPORATIONMINNEAPOLIS MN 55441

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aponte, Maximilian John Shakopee, US 8 31
Dolezalek, Charles Stacy, US 15 29
Pikkaraine, Darrell Raymond Elk River, US 7 27
Schumacher, Neal A Plymouth, US 8 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00