Hydrogen supply material and production therefor, and hydrogen supply method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11583483
APP PUB NO 20190231660A1
SERIAL NO

16327794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A layered solid formulation (100a) as one hydrogen supply material (200) according to the present invention includes silicon fine particles having a capability of generating hydrogen and aggregates of the silicon fine particles, and a physiologically acceptable medium (90b) that gets contact with the silicon fine particles or the aggregates thereof. The hydrogen supply material (200) is a hydrogen supply material for bringing the hydrogen into contact with the skin and/or the mucous membrane through the medium (90b).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIT CO LTD1-3-267 UMEDA 1-CHOME KITA-KU OSAKA-SHI OSAKA 5300001
BOSQUET SILICON CORP1-3-267 UMEDA 1-CHOME KITA-KU OSAKA-SHI OSAKA 5300001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kobayashi, Hikaru Kyoto, JP 57 471
Kobayashi, Yuki Kyoto, JP 192 940

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00