Shot peen forming system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11583976
APP PUB NO 20190047119A1
SERIAL NO

16058172

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shot-peen forming system includes a shot-sourcing chamber and a plurality of conduits, each having a first end and a second end. The first ends are coupled to the shot-sourcing chamber for receiving a portion of shot. A plurality of peen-forming jets are coupled to the second end of a respective one of the plurality of conduits. The plurality of jets are each adapted to fire shot in one of a plurality of predetermined directions to simultaneously deliver shot to a workpiece. An omnidirectional shot peening delivery system includes a plurality of nozzles positioned for shot peening from a plurality of angles, respectively. A shot distributor is adapted to receive shot through an inlet and distribute shot to the plurality of nozzles, and a workpiece holder is adapted to constrain a workpiece for receiving shot from the plurality of nozzles simultaneously to provide conformity during shot-peen forming.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXTRON INNOVATIONS INC40 WESTMINSTER ST PROVIDENCE RI 02903

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higgins, Bradley Randal Wichita, US 2 1
Huston, Joshua Ross Douglass, US 3 20
Krehbiel, David Ted Hesston, US 1 1
Shirley, Aaron Paul Wichita, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00