Mining or construction vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11585154
APP PUB NO 20210025237A1
SERIAL NO

16645354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mining or construction vehicle comprising a boom extending in a first direction, which boom, via a first and a second rotation device, is connected to a hydraulic device arranged on a mounting device arranged at a free end of said boom, the first rotation device being arranged to provide a rotation around a first axis that is substantially parallel to the first direction, and a second rotation device being arranged to provide a rotation around a second axis that is arranged at an angle with respect to the first axis. Hydraulic conduits for supply of hydraulic fluid to said hydraulic device on said mounting device are arranged through at least one of the first and second rotation devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATLAS COPCO ROCK DRILLS AB701 91 ÖREBRO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Almqvist, Marcus Örebro, SE 2 10
Andersson, Fredrik A Örebro, SE 2 1
Kumlin, Per-Anders Västra Frölunda, SE 2 1
Sjöholm, Oskar Örebro, SE 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00