Method and system for transferring a load in a thunder and lightning weather

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11588331
APP PUB NO 20210066914A1
SERIAL NO

16987864

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a load transfer method and system in thunder and lightning weather. The method includes: detecting lightning and predicting a position and time of a lightning strike to obtain a lightning prediction result; determining a transmission line possibly struck by lightning in a power grid according to the lightning prediction result; determining a load transfer scheme; and before the lightning occurs, transferring at least part of loads on the transmission line possibly struck by lightning according to the load transfer scheme.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STATE GRID SUZHOU POWER SUPPLY COMPANYNO 555 LAODONG ROAD SUZHOU SUZHOU JIANGSU PROVINCE 215004
STATE GRID JIANGSU ELECTRIC POWER CO LTD210024 NO 215 SHANGHAI ROAD GULOU DISTRICT JIANGSU NANJING NANJING CITY JIANGSU PROVINCE 210024
STATE GRID JIANGSU ELECTRIC POWER CO LTD MARKETING CENTERNO 9 AOTI STREET JIANYE DISTRICT NANJING JIANGSU 210019 210019

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cai, Yunfeng Suzhou, CN 6 3
Dai, Kang Suzhou, CN 20 90
Lu, Huiwen Suzhou, CN 1 1
Miao, Jianqiang Suzhou, CN 1 1
Tong, Chong Suzhou, CN 6 4
Wang, Liang Suzhou, CN 656 6142
Wang, Ning Suzhou, CN 346 3400
Wu, Bowen Suzhou, CN 9 22
Xu, Yang Suzhou, CN 501 4586
Yin, Wei Suzhou, CN 81 329

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00