High pressure gas generation system for hydrogen production and other applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11661339
SERIAL NO

17135787

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are apparatuses, systems, methods, and devices for generating high-pressure gas such as hydrogen and oxygen. In one aspect, an apparatus is disclosed. The apparatus includes a reactor which includes a pressure vessel containing a metal compound configured to react with a liquid to generate the high-pressure gas when the liquid is available in the vessel. The reactor includes an outlet configured to pass the generated high-pressure gas out of the vessel. The apparatus also includes a receiver configured to store the generated high-pressure gas generated in the vessel and passed to a receiver via the outlet or passed directly to fuel cell or vehicle tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ATOMICS3550 GENERAL ATOMICS COURT SAN DIEGO CA 92121

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fish, Matthew Vista, US 1 10
LeCompte, Nathaniel Spring Valley, US 1 10
Mahar, Scott Poway, US 1 10
Schaubel, Dylan Encinitas, US 1 10
Stephens, Nelson Craig San Diego, US 1 10
Wong, Bunsen La Jolla, US 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00