Hybrid electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11667184
APP PUB NO 20220227217A1
SERIAL NO

17595886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An hybrid electric vehicle (HEV) drives front wheels by a motor-generator via drive shafts by use of electricity generated by an internal combustion engine (ICE). A lower portion of the internal combustion engine is locate on a front side of a lower portion of the motor-generator in the vehicle body with being distanced therefrom. A steering gearbox is placed between the internal combustion engine and the motor-generator and located on a front side of the drive shafts. According to this configuration, driving stability, steering feeling, and noise and vibration can be balanced at a high level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTDYOKOHAMA-SHI KANAGAWA 221-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Enomoto, Toshio Kanagawa, JP 11 86
Miyakawa, Takayuki Kanagawa, JP 8 157
Nagami, Tadashi Kanagawa, JP 1 3
Tanimura, Koji Kanagawa, JP 18 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00