Reactor for biomass processing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11667862
APP PUB NO 20210139802A1
SERIAL NO

17023166

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An system for processing biomass comprising a stator, a rotor having an axis of rotation, the rotor being disposed inside the stator and configured to rotate about the axis of rotation therein, a processing chamber defined between the rotor and the stator, an inlet in fluid communication with the processing chamber which is designed to introduce unprocessed biomass into the processing chamber, an outlet in fluid communication with the processing chamber which is designed to carry out processed biomass from the processing chamber and a pump operationally associated with the inlet and the outlet, wherein the pump is configured to pump the unprocessed biomass through the processing chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRAIRIECHAR INC D/B/A/ PRAIRIE FOOD2029 BECKER DRIVE LAWRENCE KS 66047

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crawford, Curtis S Overland Park, US 1 0
Herrington, Robert K Topeka, US 5 0
Roberts, Griffin William Springboro, US 5 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00