Composition for forming insulation film of oriented electrical steel sheet, method for forming insulation film by using same, and oriented electrical steel sheet having insulation film formed therein

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11667985
APP PUB NO 20180312936A1
SERIAL NO

15770098

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a composition for forming an insulation coating film of an oriented electrical steel sheet, including a first component (A) including a composite metal phosphate, a derivative thereof, or a mixture thereof, and a second component (B) including at least two colloidal silicas having different average particle diameters, a method for forming an insulation coating film using the same, and an oriented electrical steel sheet having an insulation coating film formed thereon.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POSCO CO LTDPOHANG-SI GYEONGSANGBUK-DO 37859

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Min Soo Pohang-si, KR 26 183
Joo, Hyung Don Pohang-si, KR 16 12
Kim, Chang-Soo Pohang-si, KR 90 1085
Park, Hyung Ki Pohang-si, KR 8 11
Shin, Jae-Keun Pohang-si, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00