Apparatus for treating waste of nuclear reactor pressure vessel, and method for treating waste of nuclear reactor pressure vessel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11682496
APP PUB NO 20210287816A1
SERIAL NO

17256755

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for treating waste of a nuclear reactor pressure vessel includes: a suction unit inserted into the nuclear reactor pressure vessel through a plurality of through-pipes passing through a lower portion of the nuclear reactor pressure vessel to suck waste inside the nuclear reactor pressure vessel; a waste treatment part connected to the suction unit to treat the waste; and a lower collection part connected to the waste treatment part to be positioned under the nuclear reactor pressure vessel with the suction unit therebetween.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA HYDRO & NUCLEAR POWER CO LTDGYEONGJU-SI GYEONGSANGBUK-DO 34101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Seok-Ju Daejeon, KR 19 5
Hwang, Young Hwan Daejeon, KR 27 17
Kim, Cheon-Woo Daejeon, KR 31 51
Lee, Mi-Hyun Daejeon, KR 120 2145

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00