Apparatus and method for producing scored dough pieces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11730169
APP PUB NO 20210235708A1
SERIAL NO

16779886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Frozen un-proofed dough pieces are produced by pinching an upper skin of an un-proofed dough body to a lower skin and producing a score through the upper skin prior to freezing. The un-proofed dough pieces are formed by mass production, with an un-proofed dough sheet being cut to form dough strips which are then cut into the un-proofed dough pieces, with the score for each un-proofed dough piece being formed either before, during or after the individual un-proofed dough pieces are actually created, but before freezing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL MILLS INCNUMBER ONE GENERAL MILLS BLVD MINNEAPOLIS MN 55426

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arnall, Chad Webb City, US 1 1
Cox, Steven Long Lake, US 9 291
Henderson, Paul Farmington, US 33 449
Hobart, Kara M New Hope, US 12 8
Murch, Olivia Minneapolis, US 6 3
Rasmussen, Todd A North Branch, US 11 23
Snyder, Michael Stacy, US 88 1230
Worthy, Rodney W Oronogo, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00