System and method for controlling the operation of a work vehicle to provide improved responsiveness when commanding implement movement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11732442
APP PUB NO 20210156116A1
SERIAL NO

16690267

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling the operation of a work vehicle includes initially controlling an operation of an implement actuator of the vehicle based on operator inputs received from an input device while a load sensing system of the vehicle is operable to adjust an output of an associated pump. The method also includes receiving an input providing an indication that an implement-based movement operation is to be performed and deactivating the load sensing system in response to the indication that the implement-based movement operation is to be performed. In addition, the method includes controlling the operation of the implement actuator based on further operator inputs received from the input device to perform the implement-based movement operation while the load sensing system is deactivated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE LEAF I P INC1100 N MARKET STREET 4TH FLOOR SUITE 4010 WILMINGTON DE 19890

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gulati, Navneet Naperville, US 42 133
Wu, Duqiang Bolingbrook, US 33 151

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00