Installation comprising an auxiliary module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11732617
APP PUB NO 20230046791A1
SERIAL NO

17793390

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An installation with a steam turbine, a steam generator, and also a condenser, the steam generator being connected in terms of flow to an inlet of the steam turbine, and an outlet of the steam turbine being connected to the condenser, with the condenser being connected to the steam generator. A booster is arranged in a steam line that leads into the steam turbine in which an oxyhydrogen reaction takes place, the resulting steam being fed to a steam turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGMUNICH BAYERN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sürken, Norbert Mülheim a.d. Ruhr, DE 7 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00