Fabrication method of a plant facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11732963
APP PUB NO 20220316797A1
SERIAL NO

17628547

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To reduce work at an installation site when a plant facility is manufactured, modules are conveyed in order from a fabrication yard to the installation site, and expansion and contraction amounts of pipe spools are calculated based on a temperature difference between a temperature at the fabrication yard when the modules are manufactured and a temperature at the installation site when the modules are installed at the installation site. Further, an installation position of a foundation is adjusted toward a direction to cancel out the expansion and contraction amounts of the plurality of pipe spools, and the pipe spool is moved toward the direction to cancel out the expansion and contraction amounts of the plurality of pipe spools. The modules are installed with the positions of the end portions of the pipe spools being adjusted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JGC CORPORATION2-1 OTEMACHI 2-CHOME CHIYODA-KU TOKYO 100-0004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kishimoto, Hiroshi Kanagawa, JP 80 781
Koito, Hiroyuki Kanagawa, JP 1 0
Mikami, Makoto Kanagawa, JP 22 46
Tsutsui, Takuya Kanagawa, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00