Integrated energy conversion, transfer and storage system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11742663
SERIAL NO

17459023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated hybrid energy recovery and storage system for recovering and storing energy from multiple energy sources is disclosed. The system includes an accumulator unit having a high pressure accumulator and a low pressure accumulator. At least one piston is mounted for reciprocation in the high pressure accumulator. The accumulator unit is configured to receive, store, and transfer energy from the hydraulic fluid to the energy storage media. The system further includes two or more rotational directional control valves, in which at least one rotational directional control valve is positioned on each side of the accumulator unit. Each rotational directional control valve includes multiple ports. The system also includes two or more variable displacement hydraulic rotational units. At least one variable displacement hydraulic rotational unit is positioned adjacent each of the rotational directional control valves.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
A & A INTERNATIONAL LLCCHICAGO IL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abaitancei, Horia Brasov, RO 14 32
Ioana, Stefan Germantown, US 14 33
Mihai, Cornel Satu Mare, RO 11 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00