Apparatus for a board game

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11745089
APP PUB NO 20220258037A1
SERIAL NO

17482673

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A board game apparatus is described that includes a square playing board, and a first set and a second set of game coins. The square playing board includes a playing surface and two opposite playing sides, namely, attacking side (A) and defending side (D). The first set of game coins (f) are marked with indicia, such as I, II, III, IV, V, VII, and XI. The second set of game coins (s) consist of indicia Hash (#). The attacking side (A) is allotted with the first set of game coins (f) and the defending side (D) is allotted with the second set of game coins (s). The board game apparatus is designed to play games employing mathematical skills which provide amusement and educational stimulation to both adults and children.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PATIL PRATIMANAVI MUMBAI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patil, Pratima Navi Mumbai, IN 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00