Utilizing hydrostatic and hydraulic pressure to generate energy, and associated systems, devices, and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11746740
SERIAL NO

18153966

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, devices, and methods for utilizing hydrostatic and/or hydraulic pressure to generate energy are disclosed herein. A representative industrial system can comprise a storage tank containing fluid, a separator piston having a first separator compartment configured to be fluidically coupled to the storage tank and a second separator compartment, and a pressure intensifier. The pressure intensifier includes a first compartment, and a second compartment fluidically coupled to the second separator compartment. The second compartment of the pressure intensifier includes a pressure concentrator having a housing, a piston head member including arms, a plurality of cylinders each defined in part by the housing, and a drive piston head portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BUSHNELL JOHNTACOMA WA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bushnell, John Tacoma, US 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00