Containers for a small volume of liquid target material for irradiation in a cyclotron

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11749420
APP PUB NO 20210327600A1
SERIAL NO

17284329

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Devices, systems, and methods for efficiently preparing and containing a small volume of liquid target material for irradiation by a cyclotron are provided. In various embodiments, a device includes a housing having a chamber and the housing has a top surface that is substantially flat. The chamber has a substantially flat base and a wall having a first portion extending from the base with a first radius of curvature and a second portion extending from the first portion having a second radius of curvature that is less than the first radius. The chamber also includes an inlet aperture, an outlet aperture, and a lip having a second surface that is substantially flat and recessed from the first surface. In various embodiments, the device includes a heat sink including a plurality of parallel fins disposed around the chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DANA-FARBER CANCER INSTITUTE INC450 BROOKLINE AVENUE BOSTON MA 02215

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bars, Erol Exeter, US 7 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00