Preparation method of a fabric

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11753746
APP PUB NO 20230083800A1
SERIAL NO

17502294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a fabric, a preparation method thereof and clothing formed therefrom. The preparation method includes the following steps: obtaining bio-based synthetic fiber chips from textile waste materials; obtaining extruded filaments from the bio-based synthetic fiber chips by adopting a spinning solution; and weaving and interlocking the extruded filaments with bio-based elastic fibers to obtain the fabric. The prepared fabric is obtained from the textile waste materials, so that waste recycling is realized, and the pollution of the textile wastes to the environment is avoided. The spinning solution is adopted in the preparation process of the fabric, so that the opacity and hydrophilicity of the fabric can be enhanced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PARADISE TEXTILES LTD2306 BUILDING A JEWEL INTERNATIONAL CENTER NO 20 DONGTING MIDDLE ROAD XISHAN DISTRICT WUXI CITY JIANGSU PROVINCE 214101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herath, Achala Wuxi, CN 1 0
Mahtani, Ashok Wuxi, CN 3 1
Memon, Hafeezullah Wuxi, CN 1 0
Prakash, Sunil Wuxi, CN 7 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00