Power transmission device and engagement adjusting device for gear mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11754166
APP PUB NO 20220349463A1
SERIAL NO

17729160

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power transmission device according to one aspect of the disclosure includes a first gear, a base member, a second gear, a support block, a position adjusting unit, and a fixing unit. The base member rotatably supports the first gear. The second gear engages with the first gear so as to be able to transmit power. The support block rotatably supports the second gear. The position adjusting unit adjusts relative positions of the support block and the base member in a direction in which an engagement depth between the second gear and the first gear varies. The fixing unit fixes the relative positions of the support block and the base member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NABTESCO CORPORATIONTOKYO 102-0093

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kito, Tetsuya Tokyo, JP 1 0
Uchihara, Masato Tokyo, JP 22 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00