Precipitation hardening stainless steel and its manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11767569
APP PUB NO 20190127814A1
SERIAL NO

16306464

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a precipitation hardening stainless steel with the composition: C: 0.05-0.30 wt %, Ni: 9-10 wt %, Mo: 0.5-1.5 wt %, Al: 1.75-3 wt %, Cr: 10.5-13 wt %, V: 0.25-1.5 wt %, Co: 0-0.03 wt %, Mn: 0-0.5 wt %, Si: 0-0.3 wt %, and remaining part up to 100 wt % is Fe and impurity elements, with the additional proviso that the amounts of Al and Ni also fulfil Al=Ni/4±0.5 in wt %. Further Creq is in the interval 11-15.4 wt % and Nieq is in the interval 10.5-15 wt %. There is the possibility to have very low amounts of cobalt, well below 0.01 wt %. The precipitation hardening stainless steel displays, low segregation, high yield strength at elevated temperatures, and can also suitably be nitrided. The precipitation hardening stainless steel is more economical to manufacture compared to stainless steel according to the state of the art with the same strength at elevated temperatures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OVAKO SWEDEN AB813 82 HOFORS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andersson, Jan-Erik Falun, SE 10 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00