Mosquito control devices and systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11771073
APP PUB NO 20210076655A1
SERIAL NO

16970195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mosquito control device includes a connector positioned at a first end of the device. The connector couples to a light bulb socket to provide power to the device. The device also includes an LED light source positioned at a second end of the device and an electrocuting mechanism disposed between the connector and the LED light source. The electrocuting mechanism electrocutes the mosquitos upon contact. The device also includes a carbon dioxide generating device that generates and releases carbon dioxide to attract the mosquitos to the device. The device also includes a heater that generates and releases heat to attract the mosquitos to the device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAXTECH MOSQUITO CONTROL INC173 ROGERS STREET WATERLOO N2J 1B1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Singh, Satnam Kitchener, CA 83 1766
Smith, Mark James Kitchener, CA 1 1
Vasudeva, Kailash C Waterloo, CA 85 2110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00