Ethanol derived petrochemicals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11773331
APP PUB NO 20220325184A1
SERIAL NO

17713818

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods are described herein for upgrading ad refining hydrocarbons, and producing at least one petrochemical product, the method including: preparing a reaction mixture by adding at least two of: a quantity of bioethanol, a quantity of hydrocarbon, and a quantity of water to a reactor containment; combining the reaction mixture with a quantity of catalyst in the reactor containment; applying reaction conditions to the reactor containment thereby generating supercritical conditions for the reaction mixture and obtaining a product mixture; and extracting at least one petrochemical product from the product mixture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WORCESTER POLYTECHNIC INSTITUTE100 INSTITTUTE ROAD WORCESTER MA 01609

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Timko, Michael T Arlington, US 5 1
Tompsett, Geoffrey A Shrewsbury, US 6 1
Zaker, Azadeh Worcester, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00