Process for making a component of a turbomachine, a component obtainable thereby and turbomachine comprising the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11780010
APP PUB NO 20190201972A1
SERIAL NO

16304578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Turbomachines, as well as their components, are disclosed being in the field of production and treatment of oil and gas containing e.g. hydrocarbon plus hydrogen sulfide, carbon dioxide, with or without other contaminants. The components are made of a high corrosion high temperature resistant alloy, capable of resisting to corrosion and/or stress at high temperature better than state of art martensitic stainless steels and behaving similarly to premium nickel base superalloys, and at the same time showing a very improved hardness value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUOVO PIGNONE TECNOLOGIE SRL50127 FLORENCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buccioni, Massimiliano Florence, IT 2 3
Cappuccini, Filippo Florence, IT 7 18
Di, Pietro Domenico Florence, IT 2 3
Giannozzi, Massimo Florence, IT 29 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00