Weapon demilitarization system and process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11780191
APP PUB NO 20210178718A1
SERIAL NO

17021094

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fully automatic small arms demilitarization system includes individual infeed conveyance systems loaded at a single process initiation location; multiple hydraulic press stations fed by the individual infeed conveyance systems; and the multiple hydraulic press stations configured to crush one section of each weapon per cycle, incrementally crushing an entire length of each weapon, completely distorting each weapon to preclude restoration to a useable condition. The system further including an output system configured to output demilitarized weapons onto a common outfeed conveyance system that delivers the demilitarized weapons to a single recycle bin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAVID BOLAND INCP O BOX 1870 TITUSVILLE FL 32781-1870

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boland, David Andrew Titusville, US 2 0
Crum, Peter David Titusville, US 2 0
Harne, Garren Keith Titusville, US 2 0
Hildebrandt, Craig Kenneth Titusville, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00