Bonding dissimilar ceramic components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11780781
APP PUB NO 20210261472A1
SERIAL NO

17123616

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Adhesive compositions and methods for bonding materials with different thermal expansion coefficients is provided. The adhesive is formulated using a flux material, a low flux material, and a filler material, where the filler material comprises particulate from at least one of the two components being bonded together. A thickening agent can also be used as part of the adhesive composition to aid in applying the adhesive and establishing a desired bond thickness. The method of forming a high strength bond using the disclosed adhesive does not require the use of intermediary layer or the use of high cure temperatures that could damage one or both of the components being bonded together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 NORTH RIVERSIDE PLAZA CHICAGO IL 60606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crooks, Tab Hunter Dana Point, US 8 6
Muench, MaryAnn S La Mirada, US 10 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00