Bracket for positioning and protecting pipes in concrete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11781677
APP PUB NO 20210285570A1
SERIAL NO

17216353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bracket holds a rigid or flexible tube during the pouring of a concrete slab. The bracket has a base and a housing connected to the base. The tube curves around a first tube support on the housing before passing through an opening in the bottom of the housing. The tube and any members inside the tube are cut off so they end inside the housing and are then covered by a housing cap. The base is fastened to a form for the concrete slab. The height of the housing relative to the base is adjusted to place the cap at the planned surface of the concrete slab. After the concrete slab is formed the cap is removed and the cut members inside the housing are connected to other members or devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RELIANCE WORLDWIDE CORPORATIONATLANTA GA 30318

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cosley, James W Ramona, US 9 8
Hart, Dennis L Incline Village, US 30 376
O'Neil, Virgil San Diego, US 38 200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00