Power calculation apparatus and power calculation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11794605
APP PUB NO 20210300203A1
SERIAL NO

17211308

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power calculation apparatus predicting and calculating an amount of power suppliable from a vehicle having a battery to a power grid via a connection apparatus, the power calculation apparatus includes a microprocessor and a memory connected to the microprocessor. The microprocessor is configured to perform: predicting a position of the vehicle after a predetermined duration; predicting a degree of likelihood of connection of the vehicle to the connection apparatus after the predetermined duration, based on a predicted position of the vehicle after the predetermined duration and the connection apparatus; and predicting the amount of power suppliable from the vehicle to the power grid after the predetermined duration, based on the degree of likelihood.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO 107-8556

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanazawa, Hiroyuki Wako, JP 47 234
Kudo, Jun Wako, JP 91 2469
Otogasako, Ayano Wako, JP 5 3
Pontefract, Thomas Stephen Wako, JP 7 7
Sakurai, Takayuki Wako, JP 57 359

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00